Want to place an ad email luke@realbeer.co.nz
$50+GST / month
So I just got a call from the wife that a package from INZ Hydro has arrived fro me at home, I picked up some fittings from a local fabricator this morning, keggles (HLT/BK & MLT) last week, got my pump (Resun MD40), silicone tube should arrive on Thursday, BK/HLT element is already wired from the previous brewery.
So I think I've got everything covers... Yeah Right!
I thought I should really track my build a little better than I usually do things.
Was going to go camping tonight but the weather is crap so tonight I will:
Update 1 - March 21, 2012: (just found you can edit blogs!)
A quick update since I have been busy lately and have got some stuff together. Had my first brewnight in a long time on the new equipment and it went great. So much easier having a control panel for all the stuff!
© 2024 Created by nzbrewer. Powered by
You need to be a member of RealBeer.co.nz to add comments!
Join RealBeer.co.nz