Want to place an ad email luke@realbeer.co.nz
$50+GST / month

RealBeer.co.nz

October 2014 Blog Posts (1)

Electric keggle HLT build - Part 2

A quick update on the HLT build which is now mostly wrapped up and been through its first batch.

The lovely insulation is courtesy of a warehouse camp roll and a bunch of duct tape.

I was concerned about usability with the large gap between the tap, thermometer and sight glass and it has been a minor nuisance since the thermometer isn't easy to read from an angle. I played it safe with a fairly large gap to avoid cross over between the probes…

Continue

Added by Brett Mason on October 12, 2014 at 7:59pm — No Comments

Featured Blog Posts

Monthly Archives

2021

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

2007

© 2024   Created by nzbrewer.   Powered by

Badges  |  Report an Issue  |  Terms of Service